New valley Osc

New valley triple capacity of the old and wide open for debris to wash down

New valley triple capacity of the old

New valley that actually works since it is triple the size of the old plus the tin is pulled back so as to leave the valley open so that debris can wash out rather than create damming and back-ups of water. Take note of the tight fit between sheets in fact you cannot tell where the joints are. Other improvements to the valley is it has but one joint in it since it is over 6 meters long, it is a baked enamel finish and it has a finger bent up on the wings of the valley to further prevent any water from entering between the cladding and the valley.